Home State Jammu Chenab water level rises, 3 gates of Salal Dam opened

Chenab water level rises, 3 gates of Salal Dam opened

4
0
Chenab water level rises, 3 gates of Salal Dam opened

The dam authorities opened the gates as a precautionary measure to regulate the increased inflow into the reservoir and ensure the safe operation of the hydroelectric project. The move comes after persistent rainfall over the past several days led to a substantial increase in the discharge of the Chenab River.

Officials said the enhanced inflow was caused by heavy monsoon rains in the upper reaches of the Chenab region, resulting in a steady rise in the reservoir’s water level.

Authorities have advised people living along the downstream areas of the Chenab River to remain vigilant and avoid venturing close to the riverbanks, as water levels and flow are expected to remain high while excess water is being released from the dam.

The administration is closely monitoring the situation, and further action will be taken depending on the inflow and prevailing weather conditions.

Greater Kashmir